JBY800 polyurethane resin injection grouting machine Ladder & Scaffolding Parts - купить
Специальная цена *
Категория товара: Ladder Scaffolding Parts
История изменения цены
Купить JBY800 polyurethane resin injection grouting machine | Ladder & Scaffolding Parts











JBY800 grouting machine for crack repair polyurethane foam injection

Introduction
JBY800 grouting machine is one of the newest waterproof machine with high pressure. The machine is for crack repair and injecting the polyurethane PU foam materials to the center , the materials diffuse from center to all direction. And it will fast react with the air or water to harden to plug up the crack permanently and stop the water leakage.
Compared to the traditaional product, this machine JBY800 save time and save materials, because it is using hose suction method to feed in materials. The high pressure injection machine can stop the water immediately, especially for stop the big running water, it's fast and efficient.
Specification of machine
|
|
JBY-800 injection machine |
|
Usage |
Grouting injection foam materials |
|
Power |
910W/220V |
|
Weight |
8 kg |
|
Max output pressure |
13500pis |
|
Restart pressure |
7500pis |
|
Safe range of high pressure hose |
less than 13500psi |
|
Safe range of switch valve |
less than 10000psi |
|
Applicable materials |
PU foam agent, Epoxy resin. Polyurethane, acrylic resin,All no particles and low viscosity liquid |
|
Package |
50*19*31cm |
Accessories
|
Drill |
1 SET 910W/220V |
|
High Pressure hose |
1 PCS 5M |
|
Shut-off Value |
1 SET |
|
Repairing Kit |
1 SET |
|
Seal Set |
1 SET |
|
T Type Wrench |
1 SET |
|
Rubber Pad |
20 PCS |
|
Grease Coupler |
1 PC |
|
Filter |
1 PC |
|
Material Cup |
1 SETS |

Application Area
A variety of buildings and underground concrete cracks, expansion joints, construction joints, structural joints sealed plugging. Geological drilling engineering drilling wall plugging reinforcement. Water conservancy and Hydropower Project reservoir dam grouting, plugging cracks in the tunnel water, waterproof, impervious dam reinforced concrete cracks. High rise buildings and railroad, Highway Roadbed Stabilization. Coal mining and other mining engineering of tunnel water plugging, roof breaking layer reinforcement. Bridge foundation reinforcement and the bridge body crack of reinforcement. Deformed Reinforcement of buildings, concrete structures such as the Water Tower, pool crevice reinforcement and prevent subsidence. Soil improvement, soil surface protection and stability reinforcement.
Usage
1. The new injection pump should be lubricated by the lubricant before using. The body and the accessories should be mopped with a lubricant saturated cloth.
2. Pour the even polyurethane or epoxy into the material cup and cower the lid. Turn the switch to open and the injector to then dust bin.
3. Turn of the power switch, expel the lubricant from the hose until the medicament come out. Turn off the power and then the switch valve.
4. After construction, clean up the injection pump immediately with special cleanser (acetone or xylene).Pour the cleanser into the material cup and expel it from the hose. Put the injector into the material cup, turn on and off the switch valve for several times to create pressure in the hose. It help clean. After 3 to 5 minutes, expel the cleanser from the pump to the dustbin.
5. After that, lubricant is necessary for maintain to avoid residue blocking in the hose, let it cycles one time for maintenance.
Application Materials
PU foam agent, Epoxy resin. Polyurethane, acrylic resin.
All no particles and low viscosity liquid
Polyurethane foam separately pours into the feed cup. Firstly, turn off the switch of straw and insert the double-liquid needle locked, start the power switch and inject the water-sealing agent into the body for leak stoppage & reinforcement.
The machine should work with injection packers, if you need it, you could order it together, please click the aboved picture to place an order.
There are size is 13mm*80mm, 13mm*100mm, 13mm*150mm.
Trouble shooting
1. Ask: Leaking in the nozzle while injection?
Answer: The rubber nut wears out in the nozzle. Dismount the nozzle and replace it with a new one.
2. Ask: The pressure of the pump cannot raise?
Answer: Take of the four hexagonal screws in the pressure increasing cylinder, clean groove in the pressure pump with hard brush (steel brush) and steel ball, spring and pressure increasing cylinder. If the surface of the steel ball is not smooth enough, please replace it and assemble it. Adjust the screw, any leaking while injection, please adjust the screw with the special spanner. If it can’t be adjust, please change the washer.
3. Ask: Piston if full of the residue?
Answer: Clean up the residue on the piston.
Take attention
Please wear protective supplies ( such as gloves, masks, goggles ) when operating to avoid direct contact with the skin. If contamination of slurry please rinse with water. When the eyes are polluted firstly rinse with plenty of water immediately after the hospital.
Package, one set in one box.
Fast Shipping
After order, we will choose the best shipping way for you in the same cost (DHL,Fedex, EMS,USP and so on...) shipping days only 4 to 10 days.
1. Orders will be shipped out in 2 days after payment cleared. All items will be tested it well in advance before sending out.
2.After order, please keep contact with us, it need you to confirm information of INVOICE, it is important. Thanks.
Contacts: kindy
Tel and whatspp:+86-18680531938
Wechat:A18680531938 If any question, please feel free to contact me.
Отзывы о JBY800 polyurethane resin injection grouting machine Ladder & Scaffolding Parts
Здесь вы можете оставить свой отзыв о данном товаре.
